147. The operator of a cement plant must, at least once a year, for each kiln and clinker cooler, perform emissions testing of the gases emitted into the atmosphere, calculate the emission particle rate, and for that purpose, measure each of the parameters necessary for the calculation.
The operator must carry out the first sampling and calculation within 1 year as of 30 June 2011 in the case of existing kiln and clinker coolers of a cement plant or within 1 year as of the date on which it is put into operation.